文本描述
北京建筑大学硕士学位论文原创性声明
本人郑重声明:所呈交的学位论文,是本人在导师的指导下进行的研究工作及取得
的研究成果。尽我所知,除了文中特别加以标注和致谢的地方外,论文中不包含其他人
己经发表或撰写过的研究成果,也不包含本人或他人为获得北京建筑大学或其它教育机
构的学位或学历证书而使用过的材料<=与我一同工作的同志对本研究所做的任何贡献均
己在论文中作了明确的说明并表示了谢意。_
若有不实之处,本人愿意担相关法律责任。
学位论文作者签字:付
考
曰期:及/8年么月I曰
北京建筑大学硕士学位论文版权使用授权书
本人完全了解学校有关学位论文知识产权的规定,在校攻读学位期间论文工作的知
识产权属于北京建筑大学,允许论文被査阅和借阅〇学校有权保留论文并向国家有关部
门或机构送交论文纸质版和电子版,可以将本学位论文的全部或部分内容编入有关数据
库进行检索,可以采用影印、缩印、或扫描等复制手段保存和汇编学位论文。
保密学位论文在解密后的使用授权同上s
学位论文作者签名:校内导师签名:t
年》月I曰年^月I曰
校外导师签名
>作年6月I曰
Abstract
The level of management engineering of municipal construction enterprises is not only
reflected in the arrangement of site construction site, quality control and safety control, but
also embodied in the cost control, in addition to the profit level of an enterprise. A project to
save the cost of earnings is not enough. A good management level reflects not only internal
cost saving but also risk management. We should instilling the idea of management and risk
control into everyone in the enterprise. People who are in the field of construction at the site
of the site, or people who are sitting in the office every day, know the importance of risk
management, and everyone is a participant in risk management. Let everyone in the project
know the change of cost clearly. The construction project with frequent risk points will be
noticed by the staff. Only a full participation risk control can minimize or eliminate the risk
uncertainty that may affect the cost. This can create more profits for a construction enterprise,
so the municipal construction project cost risk in forecasting research has become
increasingly important. Through the research on the cost risk prediction of the construction
project of F municipal engineering company, this paper identifies the common cost risk and
establishes the cost risk prediction model in the construction project of the company, which
can guide the company's cost risk prediction and cost risk response. From passive processing
risk to active risk prevention, it ultimately achieves the role of minimizing costs and avoiding
risks for the company.
Taking the cost risk of F municipal construction project as the research content, this
paper uses the weighted Markov chain theory to predict the cost risk of the construction
project of F municipal corporation, and provides the basis and suggestion for the management
of the F company. The first part of the article is the prolegomenon, mainly including the
background, the purpose and significance of the research; the second part is mainly written as
the theoretical basis of the risk management theory and the weighted Markov chain
forecasting model basic concepts; the third part is based on the actual situation of F company,
the establishment of the company's cost risk prediction index system; The fourth part
establishes a cost risk prediction model of F municipal construction project based on
Weighted Markov chain. The cost risk prediction model of construction projects; the fifth part,
based on the weighted Markov chain model established by the fourth part of F company, is
used to predict the cost risk, and the feasibility of the model is tested. The last part of the
article is the conclusion, shortage and prospect.
Keywords: Weighted Markov chain, Construction of municipal engineering project,
Cost risk prediction.。