INFORMATIVE ABSTRACT
We did analysis for capacity and management of steering column
production line. We have introduced the current capacity of production line
of steering column and the manufacturing method of upper column. Also, we
have introduced factors for production capacity and KPIs of evaluation.
During the analysis process, we have used 6 sigma tools. These tools have
increased our efficiency of quality problem analysis. With the help from that,
we have found out root cause and reduced scrap rate efficiently. Through
the project, we did successful communication with operators. We let them
know why we need to do this capacity increase. So that they can understand
the project and give fully support for this activity. We also used SMED tools
to reduce changeover time to reach final target. During whole project, we
have defined several teams to deal with different factors for OEE. The teams
used efficient tools to analyze indicators for OEE. Each team focused on
one item and did deep analysis. A lot of actions were taken to improve our
final performance.
Key words: Scrap rate, 6 sigma, Performance efficiency, OEE, Equipment
availability, SMED