文本描述
摘要 因海阳市经济快速发展,特别是在经济发达的核电产业区,现有的变电站 无法满足产业区的负荷,需要建设llOkV留格输变电工程。本文结合一般性可研 报告的要求,对国网公司输变电工程可行性研究报告的要求进行了分析研究, 结合海阳电网的实际情况提出了 llOkV输变电工程可行性研究报告的内容和要 求。 本文对电网系统现状进行了分析,在负荷预测和现场勘査的基础上,深入 分析研究了 llOkV输变电工程典型设计,通过多种方案对比进行了 llOkV留格输 变电工程可行性研究和设计。 通过现场勘查,完成了变电站的选址,按入系统方案,建设规模和系统通 信方案,并对设备进行了选型,对变电站的建设进行了布置。完成了送电线路 的路径选择,铁塔、导线及电缆的选型,确定铁塔的基础型式等工作。据此建 设规模及工程量,做出了工程投资估算,并进行了投资分析,使得可行性研究 报告达到了初步设计的深度,得出了该工程的建设是必要的,且在技术上是可 行的,在经济上是合理的结论。 变电站站址和llOkV线路路径均取得了当地政府部门主管部门的批复,保证 了设计方案的可行性。 目前该工程项目的初步设计已获省公司批准,进入具体的设计、施工阶段, 实现报告的实用价值和工程价值,切实解决了实际工作中的具体问题。 与llOkV留格输变电工程相关的、llOkV望石站第二电源的可行性研究分析 也在此报告中一并确定了具体解决方案。 关键词:llOkV输变电工程,设计,可行性 华北电力大学专业硕士学位摘耍 ABSTRACT Due to rapid economic development in Haiyang city,Especially in economically developed area of the nuclear power industry base, the existing substation cannot meet the load of industrial base, need to build 110 kV power transformer engineering. Combining with study in the general requirements of the feasibility, priorities and transformation project of the feasibility study report of the requirements are analyzed and studied, combined with the practical situation of the grid Haiyang proposed 110 kV power transformer engineering feasibility study report of the content and requirements. In this paper, the grid system analysis of the current situation, in the load forecast and field exploration, and on the basis of the deep analysis of the study of 】】0 kV transformer engineering typical design, through a variety of solutions of 110 kV contrast a lattice of project feasibility study and design transformation. Through the exploration, the completion of the transformer substation of location, press into the system solutions, the scale of development and system communication solution, and the selection of equipment and the substation construction layout. Completed the path choice of transmission lines, the tower, wire and cable selection, determine the foundation of the tower type, According to the scale of development and amount, make the project investment estimation, and investment analysis,makes the feasibility study report to the depth of the preliminary design, that the engineering construction is the necessary, and in technology is feasible, in economically rational conclusion. Substation and 110 kV lines path has obtained the local government departments of the competent department of reply, ensure the feasibility of the design plan. At present the project preliminary design already for provincial company approved, into the specific design, construction stage, and the realization of the practical value and report engineering value to solve the actual problem in the work of the specific. And 110 kV Liuge power transformer engineering related, 110 kV Wangshi power station of the feasibility research and analysis in the report to determine the specific solutions together. Key words: 1 lOkV transmission and substation project, design, feasibility 华北电力大学专业硕士学位目录 目录 I Abstract 11 第i章绪论 1 l.i课题的背景及研究意义 1 1.2国内外发展水平及动向 1 1.2.1 GIS 设备 1 1.2.2变电站的布置型式 2 1.2.3无人值班变电站和综合自动化系统 2 1.2.4智能电网和智能变电站的建设 2 1.3本课题研究的主要内容 3 第2章110KV输变电工程可行'注研究要求及内容 4 2.1 一般可行性研究报告的编制要求 4 2.2 11 OkV输变电工程可行性研究内容 4 2.2.1编制依据、原则和范围 4 2.2.2工程建设的必要性 5 2.2.3系统方案和建设规模 5 2.2.4变电站站址和工程设想 5 2.2.5送电线路路径选择及工程设想 6 2.2.6系统通信方案 6 2.2.7投资估算和建设时间 6 2.2.8投资造价分析 6 2.3 ;$:割、g 8 第3章1】0KV留格输变电工程可行性研究报告 9 3.1设计依据、原则及范围 9 3.1.1设计依据 9 3.1.2设计范围和设计原则 9 3.1.3设计水平年 9 3.2工程建设的必要性 9 3.2.1电力系统现状 9 3.2.2负荷预测 11 3.2.3建设必要性 12 3.2.4前期工程开展情况 13 3.3系统方案和建设规模 13 华北电力大学专业硕土学位目录 3.3.1接入系统方案 13 3.3.2建设规模 13 3.4变电站站址和工程设想 15 3.4.1变电站站址选择 15 3.4.2变电工程设想 18 3.4.3电力系统二次 19 3.4.4 土建部分 22 3.5送电线路路径选择及工程设想 23 3.5.1进出线的布置 23 3.5.2线路路径的选择 24 3.5.3气象条件的选择 28 3.5.4架空导、地线的比较选型及技术措施 28 3.5.5绝缘配合 31 3.5.6铁塔及基础的选型设计 32 3.5.7电缆工程部分 36 3.5.8通信影响及防护 39 3.6系统通信 39 3.6.1通信现状 39 3.6.2通信方案 39 3.6.3设备的防雷接地 40 3.7投资估算及建设时间 41 3.8投资造价分析 41 3.8.1变电站工程投资造价分析 41 3.8.2线路工程投资造价分析 42 3.9本章+结 43 第4章结论与展望 45 4.1本文的主要工作及成果 45 4.2对未来工作的展望 45