Master's Dissertation of Chongqing University of Technology
Research on Work Injury Compensation
and Prevention in Engineering Project
under BT Mode - Taking WHX Company
as an Example
Postgraduate:Kong Bingtao
Supervisor:Prof. Chen Yuangang
Degree Category: Professional Degree
Specialty: MBA
Research Direction: Labor and Social Security
Training Unit:MBA Education Center
Thesis Deadline: March.10, 2018
Oral Defense Date:May. 26, 2018
学位论文原创性声明及授权声明
重庆理工大学
学位论文原创性声明
本人郑重声明:所呈交的学位论文是本人在导师的指导下,独立进行研宄所取得的
成果<=除文中特别加以标注引用的内容外,本论文不包含任何其他个人或集体已经发表
或撰写的成果、作品。对本文的研宄做出重要贡献的集体和个人,均已在文中以明确方
式标明。
本人承担本声明的法律后果。
作者签日期:年/月>170
学位论文使用授权声明
本学位论文作者完全了解学校有关保留、使用学位论文的规定,同意学校保留并向
国家有关部门或机构送交论文的复印件和电子版,允许论文被查阅和借阅。本人授权重
庆理工大学可以将本学位论文的全部或部分内容编入有关数据库进行检索,可以采用影
印、缩印或扫描等复制手段保存和汇编本学位论文。
本学位论文属于(请在以下相应方框内打
“V”):
1.保密口,在__年解密后适用本授权书。
2.不保擔£3^
"
作者签名沖
濟
日期/月
导师签名:曰期:加务年‘月^曰
I
摘 要
近年以来国家大力推进风险较高、农民工集中的建筑业工伤保险工作,大力推进
工程总承包的发展,通过研究建筑业承包模式未来发展方向的工程总承包模式,选取
一种之前发展过程中运用且完成较多的BT模式下工程项目工伤赔付及预防研究,分
析其存在的工伤赔付及预防问题并给出相应对策建议,为建筑业中BT等工程总承包
模式下工伤赔付及预防提供借鉴思路,并期望进而推进整个建筑业的工伤赔付及预防
因工程总承包模式具有诸如有利于发挥工程总承包企业总包管理优势等特点,近
年来国家一直在推进工程总承包的发展,相应各种模式的工程总承包应运而生,特别
是其中的BT(建设—移交)模式运用且完成多,但发现日趋成熟的BT模式下工程
项目工伤赔付及预防并未充分体现BT总承包模式的管理特点和优势,仍然存在传统
承包项目出现的各类工伤赔付及预防问题。因此,探索形成BT模式下工程项目的工
伤赔付及预防思路和现状优化,以真正提高BT模式下工程项目工伤赔付及预防水平,
减少工伤事故发生,改善工伤赔付运用,取得员工、企业和社会都满意的共赢效果
本文从工伤赔付及预防国内外研究现状和现有各项制度入手,逐步分析BT模式
下工程项目即WHX公司工伤赔付及预防现状和存在问题,并列举WHX公司工伤赔
付及预防问题典型案例,通过对总体问题的揭示和典型案例的剖析,直追其问题根源,
分析研究后提出了BT模式下工程项目工伤赔付及预防应遵循的思路,尝试对BT模
式下工程项目工伤赔付及预防现状优化,并探讨了思路和优化在其他工程总承包模式
中的运用和推广
关键词: 工程总承包;BT模式;工伤赔付;工伤预防
III
Abstract
In recent years, the state has been promoting employment injury insurance in the
construction industry for builders at greatest risk. It is an off-farm workers centralized area.
The state has been promoting the general contracting of projects and the corresponding
general contracting of various modes of operation has taken shape, in particular, the
construction of the general contract contracting mode (BT) Model. However, the author
found that even with the growing usage of the BT project, some aspects with regard to the
work injury compensation and prevention and management do not thoroughly reflect the
characteristics and advantages of this model, and there are still individual contracted
projects of various types of work injury claims and prevention problem. Therefore, it is
suggested that a scheme of work injury compensation and prevention management under
BT model should be designed to raise the level of work injury compensation and
prevention management in BT mode, thereby reducing the occurrence of work injury
accidents, improving the utilization of work injury compensation and achieving the
win-win results for the enterprises, employees and society.
This article starts with the basic theory of work injury compensation and prevention,
and analyzes the current situation and characteristics of work injury compensation and
prevention management in WHX Company under BT mode step by step. Then, in
accordance with BT model, it will put forward basic ideas in terms of the problems in work
injury compensation and prevention management of WHX Company. Through the analysis
of the overall problems and typical cases, we can catch up with the root causes of the
problems and put forward the new ideas and concepts that can be applied to the cases
related to the industrial injury compensation and prevention in the BT mode after the
analysis and research. At the same time, we try to build the management scheme of the
industrial injury compensation and prevention in BT mode, and discusses the
implementation and promotion plan.
Keywords: Project general contracting; BT model; compensation for industrial injury;
prevention of industrial injury。