本文通过对印度 XX 电站工程的范围、特点、标准进行深入的分析,将质
量、进度、费用等三个主要方面作为主线,以设计、采购、生产、发货、安装
指导和调试指导、风险分析和预算管理为对象,找出了该项目执行的特点和难
点。之后通过运用美国项目管理协会主推的项目管理方法即 9 大知识体系,从
质量、进度和成本等三个方面制定了适合项目执行的控制方案。最后通过具体
的措施,保证了方案的执行并在项目供货结束后初步实现了项目的目标,收到
了较好的效果。
关键词:质量控制;进度控制;成本控制;项目管理哈尔滨工业大学工商管理硕士学位论文
- II -
Abstract
With the development of science and technology, the size of project
constructing is getting larger and has higher technical quality and systematization,
which means higher complication. Especially in recent years, the single installed
capacity of the thermal power construction projects has been improving over time.
Both domestic and foreign scholars and the general contracting companies are
researching the control and implementation of the power engineering procurement
construction (EPC) projects, from which they obtained lots of experience. In the
progress of the implementation of domestic EPC, a solid base of the control systems
of the general contracting companies are constructed through the practice and
conduction of the national standards and rules. However, when implementing of this
system in overseas projects, the effects of this system are extremely limited due to
the impacts of abroad engineering practices, years of the convention of local owners,
the restrictions of laws and other factors from society, politics, finance, culture,
human geography, manners and customs, as well as the factors of the commitment
and comprehension of the business owner.
Under a deep analysis about the scope, characteristics and standard of XXXX
Power Station Engineering of India, this paper makes a main line from three aspects
of quality, schedule and cost, finds out the features and difficulties in project
implementation by taking design, procurement, production, delivery, installation
guide, debugging guide, risk analysis and budget management as research objects.
By using nine general theories of project management system- quality from PMI, a
control program is constructed from quality, schedule, and cost. Finally, through the
concrete measures to ensure the implementation of the scheme and the project, and
primarily realized the goal of the project after the supply, the project has received a
good effect.
Key words:quality control, schedule control, cost control, project management